Healthcare · Consumables, sterile supplies & AMC

AMC and CMC service contracts across the installed base

Multi-year service, calibration and uptime inside 10-year total cost.

Indicative cost in IndiaNot published — established on aggregation
Register this requirement — free

The range above is an indicative planning figure taken from our own research, not a quotation and not an offer. buytogethr is pre-launch and has closed no pools.

What you are actually buying

An AMC covers labour and preventive visits; a CMC is meant to cover parts as well, and the distance between the two is the exclusion list. Contracts routinely carve out precisely the components that fail: X-ray tubes, detectors, ultrasound probes, coils, batteries, glassware, and anything a supplier chooses to call a consumable. What the institution is really buying is a defined uptime with a defined remedy, engineers within reach, and parts held in the country. The costly mistake is sequencing – buying the machine on price and taking up maintenance when the warranty expires, at which point the supplier holds every card. Maintenance priced into the original award, across the full ten-year horizon, is a different negotiation.

Why amc/cmc service contracts suits collective purchasing

Service is among the best pooling candidates, and it is what holds a group together after equipment is delivered. On its own, a mid-size hospital's installed base does not justify an engineer stationed nearby or a parts shelf in the state; the same equipment counted across a group does, and that is a commitment a supplier can be asked to make. The pooled unit is not a single price – rates properly follow each machine's age and model – but common contract language: uptime and how it is measured, response and resolution times, the exclusion list, and the escalation applied at each renewal.

Pin down before price

  • AMC or CMC stated plainly, with included and excluded parts named item by item
  • Uptime commitment, how downtime is measured and clocked, and the remedy when it is missed
  • Response and resolution times, and the number of preventive maintenance visits a year
  • Engineer location, and the parts stocked in-country for these specific models
  • The rate for every renewal year fixed at award, not at the moment the warranty lapses

What drives ten-year cost

  • Excluded parts – tubes, detectors, probes, coils, batteries – which carry the real cost
  • Escalation compounding across each renewal year
  • Revenue lost while a machine waits for a part in transit
  • The premium paid when maintenance is negotiated after the warranty has already lapsed

How a pool for this runs

1
Aggregate the demand. Institutions register a requirement and a timeline. Nothing is committed and nothing is paid — the pool simply establishes how much demand exists in one window.
2
Standardise the specification. One technical specification is written for the pooled requirement, so every bidder quotes the same machine. Clinical and engineering specification is never traded away for price.
3
Qualify the suppliers. OEMs and authorised distributors are qualified on manufacturer authorisation, past performance, end-user certificates, financials and demonstration — before any price is opened.
4
Run the price competition. Only technically qualified bidders enter an online reverse auction, with a minimum decrement and automatic extension so the close cannot be sniped.
5
Award on ten-year cost. Lowest is judged on total cost of ownership over ten years — machine, turnkey, software, accessories, transport, insurance, taxes, warranty, maintenance contract, tubes, uptime and training.
6
Buy directly, individually. Each institution raises its own purchase order against the negotiated price and pays the OEM or dealer directly. buytogethr never takes title, never holds stock and never holds your money.

Also pooled under Consumables, sterile supplies & AMC